Service: Employer's Agent
Fairfax Crescent
Calderdale
Mosscare St Vincents appointed us to their project which aimed to revitalise Fairfax Crescent, enhancing the living environment and improving facilities for residents
A disused former recreation ground over looked by houses on all sides and mainly used as an area for fly tipping. The scheme comprises of 6 3-bedroom semi detached houses and 3 2-bedroom terrace houses fronting onto the existing Fairfax Crescent.
The houses are designed to be contemporary in appearance while taking material palettes from the neighbouring properties to complement and enhance the feel of the area. The houses are faced in an artificial stone which resembles the locally produced stone blocks and all properties have the infrastructure in place to allow for electric vehicle charging.
This project was delivered by Arcus Consulting LLP.
Take a look at similar projects
See all projectsBe part of the journey
We believe the best outcomes are built on partnerships rooted in purpose, driven by insight, and fuelled by ambition. Whether you’re shaping places, transforming communities or redefining what’s possible, we’re here to help you make it happen.
Bring your next project to life
Our multidisciplinary teams work with clarity and purpose to turn your vision into value. By combining insight, innovation, and technical excellence, we shape places that make a real difference.
Contact usJoin the team and do something amazing
Whether you’re taking the first step or ready for something new, Baily Garner is the place to grow. With inspiring projects, supportive teams, and clear development routes, your next opportunity is waiting.
Find out moreSt Luke’s Church
Newcastle
We were appointed to support the redevelopment of St Luke’s Church and the creation of Kathleen Court in Newcastle, providing architectural, Employer’s Agent and Quantity Surveying services. The £1.6 million project combined the refurbishment of the existing Grade II listed church with new community facilities and 11 two-bedroom affordable homes for social rent, including a fully wheelchair-accessible property.
The redevelopment was delivered as three closely connected elements: replacing the ageing church hall with purpose-built community facilities, constructing the new affordable housing and refurbishing the existing church. The sale of the former hall site for housing helped fund improvements to the church, enabling both elements to be developed collaboratively and delivered in parallel.
The constrained site and proximity of the new development to the Grade II listed church created a number of design and construction challenges. Demolition and construction works had to minimise vibration and disturbance to protect the historic building, while restricted access and limited space for storage required careful coordination of construction activities and deliveries.
The design also needed to respond sensitively to the architectural and historic significance of the church while addressing parking, overlooking, rights of light and potential noise transmission from the neighbouring town hall.
We worked closely with the project team and local stakeholders to develop a coordinated design that responded to the site’s heritage, access and construction constraints. Our involvement included:
- Developing the design in consultation with the local authority planning and highways departments, Historic Building Officer and Diocese Advisory Committee.
- Undertaking detailed transport analysis to support negotiations with the highways department and justify the exclusion of on-site parking.
- Delivering three public consultation exercises involving the local community and church attendees.
- Using micro-piling with water-flush rotary drilling to minimise vibration and disturbance to the neighbouring listed building.
- Coordinating construction phasing and just-in-time deliveries to respond to restricted site access and storage.
- Managing project risks through a regularly updated project risk register.
- Incorporating findings from a noise impact assessment into the design before tender.
- Using timber frame construction, structurally insulated panels manufactured off-site and bathroom pods to improve construction efficiency, minimise waste and support cost control.
The project successfully brought together new affordable housing, modern community facilities and the sensitive refurbishment of a Grade II listed church within a challenging and constrained site. The housing development also helped fund the church improvements, creating a mutually beneficial relationship between the two elements of the scheme.
The development achieved Code for Sustainable Homes Level 3 and incorporated the principles of Building for Life, Secured by Design and Lifetime Homes. Innovative design and modern methods of construction helped maintain design quality while controlling construction costs, improving efficiency and reducing waste.
Take a look at similar projects
See all projectsBe part of the journey
We believe the best outcomes are built on partnerships rooted in purpose, driven by insight, and fuelled by ambition. Whether you’re shaping places, transforming communities or redefining what’s possible, we’re here to help you make it happen.
Bring your next project to life
Our multidisciplinary teams work with clarity and purpose to turn your vision into value. By combining insight, innovation, and technical excellence, we shape places that make a real difference.
Contact usJoin the team and do something amazing
Whether you’re taking the first step or ready for something new, Baily Garner is the place to grow. With inspiring projects, supportive teams, and clear development routes, your next opportunity is waiting.
Find out more